Kitchen · Baking schedule · Active

Sourdough Rolling System

Fresh sourdough every 2-3 days, with all hands-on work happening in one evening window. A rolling, overlapping cycle: on the same evening, bake the loaf started 2-3 days ago and immediately mix and shape the next one — so exactly one loaf is always resting in the fridge, with no idle days and no daytime attention needed.

Method

Double cold fermentation

Short warm bulk right after mixing, then shaped and cold-proofed 48-72h, baked straight from the fridge.

Cycle length

Every 2-3 days

48h fridge time → 2-day cycle. 72h → 3-day cycle. Adjustable cycle to cycle.

Active time

~20-30 min per cycle

Bulk fermentation and cold proof need no attention — only mixing, folds, and shaping are hands-on.

Minimal recipe (one loaf)

Ingredient Amount Baker's %
Bread flour 500 g 100%
Water 350 g 70%
Active starter 100 g 20%
Salt 10 g 2%

~960g total dough, one loaf. Scales linearly for a larger loaf or two parallel loaves (see the extension below). 70% hydration is deliberately on the higher side, since the schedule's own constraints call for that — it holds up better through 48-72h of cold retardation than a stiffer dough would.

Step-by-step timeline (single cycle, evening-only)

Step Time Duration Action
1. Autolyse 19:00 30 min Mix flour + water only, let rest.
2. Mix in starter and salt 19:30 10 min Incorporate active sourdough starter and salt into the autolysed dough.
3. Short warm bulk fermentation 19:40 – 21:30 ~2 hours 3-4 stretch-and-folds at roughly 30-minute intervals to build dough strength. Overlaps with other evening tasks.
4. Shaping 21:30 10 min Shape the dough and place it in a proofing basket (banneton).
5. Cold retardation starts ~21:40 48-72 hours Cold proof at 4-8°C (48h for a 2-day cycle, 72h for a 3-day cycle). No attention needed.
6. Baking evening, 2-3 days later 45-60 min Bake directly from cold, straight out of the fridge — no warm-up needed, roughly 5-10 minutes longer than a room-temperature loaf.

The rolling cycle

Every baking evening, two things happen back to back: bake the loaf that has finished its 48-72h cold proof, then immediately start steps 1-5 for the next loaf. Baking day and mixing day are always the same day, so there is always exactly one loaf resting in the fridge. Choosing 48h vs. 72h fridge time controls whether the cycle repeats every 2 or every 3 days, and this can be adjusted flexibly cycle to cycle depending on schedule.

Starter (levain) maintenance

Feed/refresh the starter as part of step 1, on the same evening: remove the portion needed for the new dough before feeding, then feed the remaining starter and return it to the fridge. The starter only needs attention every 2-3 days, in sync with the bread cycle.

Key parameters and constraints

Optional extension

For baking more frequently than every 2-3 days, a second proofing basket can be introduced to run two loaves in parallel, offset by 1-2 days.